MYNYDD CYNFFIG JUNIOR SCHOOL, PWLLYGATH STREET, KENFIG HILL, BRIDGEND / YSGOL GYNRADD MYNYDD CYNFFIG, STRYD PWLLYGATH, MYNYDD CYNFFIG, PEN Y BONT A’R OGWR
Asbri Planning Ltd. has been commissioned by Bridgend County Borough Council to undertake pre-application consultation in respect of a full planning application for the demolition of Mynydd Cynffig Junior School, air training corp facility, play area and loss of allotment gardens and construction of a new primary school, 2no. all weather sports pitches, floodlighting, solar panels, replacement allotment provision, play areas, open space, access and highways arrangements, parking, landscaping, drainage and all other associated works at Mynydd Cynffig Junior School, Pwllygath Street, Kenfig Hill, Bridgend, CF33 6ES.
Prior to formal submission to the Local Planning Authority and in accordance with the requirements set out in Part 1A of the Town & Country Planning (Development Management Procedure) (Wales) Order 2012 (as amended), the proposal will be subject to pre-application consultation.
All relevant drawings, reports and supplementary supporting documents are made available for inspection and review online below. Computer facilities are available at Pyle Library, Pyle Life Centre, Helig Fan, Pyle, Bridgend, CF33 6BS. The identified library is open as follows;
Monday – Friday 09:00-18:00
Saturday 09:00-15:00
Please note that the library is closed on a Sunday.
Anyone who wishes to make representations about this proposed development must do so by the 8th December 2023. We would encourage you to e-mail these to mail@asbriplanning.co.uk, alternatively please download the attached form, and send them to;
Asbri Planning Ltd, Unit 9 Oak Tree Court, Mulberry Drive, Cardiff Gate Business Park, Cardiff, CF23 8RS.
A public engagement event has been organised to provide the public with an opportunity to discuss the proposals with Bridgend County Borough Council and the design team. The event is to be held at Mynydd Cynffig Primary School, Pwllygath Street, Kenfig Hill, Bridgend, CF33 6ES on Tuesday 21st November 2023 between 15:45-19:00. We look forward to welcoming you to discuss the scheme and understand your feedback.
Mae Asbri Planning Ltd wedi ei gomisiynu gan Cyngor Pen y Bont a’r Ogwr i drefnu ymgynghoriad cyn gwneud cais cynllunio ar gyfer cais cynllunio llawn i ddymchwel Ysgol Gynradd Mynydd Cynffig, cyfleuster corff hyfforddi awyr, ardal chwarae yn ogystal â cholled rhandiroedd, i alluogi ailddatblygiad y safle i gynnwys ysgol gynradd newydd, 2 gae chwaraeon aml-dywydd, llifoleuadau, paneli solar, darpariaeth rhandir newydd, ardaloedd chwarae, ardaloedd awyr agored, trefniadau mynediad a phriffyrdd, parcio, tirlunio, systemau draenio a holl waith cysylltiedig ar safle Ysgol Gynradd Mynydd Cynffig, Stryd Pwllygath, Mynydd Cynffig, Pen y Bont a’r Ogwr, CF33 6ES.
Cyn cyflwyno’r cais yn ffurfiol i’r Awdurdod Cynllunio Lleol ac yn unol a gofynion Rhan 1A o Orchymyn Cynllunio Gwlad a Thref (Gweithdrefn Rheoli Datblygu) (Cymru) 2012 (wedi diwygio), bydd y cais yn destun ymgynghoriad.
Mae’r cynlluniau, adroddiadau a dogfennau ategol ar gael i’w harchwilio a’u hadolygu ar-lein, isod. Mae modd defnyddio cyfleusterau cyfrifiadurol yn Llyfrgell Pîl, Canolfan Bywyd Pîl, Helig Fan, Pîl, CF33 6BS. Mae’r llyfrgell ar agor fel a ganlyn:
Dydd Llun – Dydd Gwener 09:00-18:00
Dydd Sadwrn 09:00-15:00
Mae’r llyfrgell ar gau ar Ddydd Sul.
Dylai unrhyw un sydd yn dymuno gwneud sylwadau ynglŷn a’r datblygiad arfaethedig wneud erbyn yr 8fed o Ragfyr 2023. Rydym yn eich annog i e-bostio eich sylwadau at mail@asbriplanning.co.uk, neu lawrlwytho’r ffurflen atodol a’u gyrru at:
Asbri Planning Ltd, Uned 9 Oak Tree Court, Mulberry Drive, Parc Busnes Porth Caerdydd, Caerdydd, CF23 8RS.
Mae digwyddiad ymgynghori wedi'u trefnu i roi cyfle i'r cyhoedd drafod y cynigion gyda Cyngor Pen Y Bont a’r Ogwr a'r tîm dylunio. Mae'r digwyddiad i'w cynnal yn Ysgol Gynradd Mynydd Cynffig, Stryd Pwllygath, Mynydd Cynffig, Pen y Bont a’r Ogwr, CF33 6ES. Cynhelir y digwyddiad ar Ddydd Mawrth 21ain o Dachwedd 2023 rhwng 15:45 a 19:00. Mae’r tîm yn edrych ymlaen at eich croesawu i drafod y cynllun a thrafod eich adborth.
-
Planning, Design and Access Statement
Architecture
General Arrangement Floor Plans
Elevations Feature Walls Panels
Cycle Shelter & ASHP Enclosure
Sprinkler Plan and Refuse Enclosure
General Arrangement Fire Strategy
Roof Plan inc Penetration Setting Out
General Arrangement Sections Sheet 01
General Arrangement Sections Sheet 02
General Arrangement Sections Sheet 03
Boundary & Separation Fencing Sheet 1
Boundary & Separation Fencing Sheet 2
Typical Allotment Details Sheet 1
Typical Allotment Details Sheet 2
Lighting Plans
External Lighting MUGA Elevations
Electrical
BCB0103093 E01 PROPOSED LIGHTING & CONTROLS _ PAC
BCB0103093 E04 - PROPOSED SECURITY_PAC
BCB0103093 E12 - PROPOSED EXTERNAL SERVICES_PAC
BCB0103093 E19 - PROPOSED SOLAR PV_PAC
BCB0103093 E20 - PROPOSED LIGHTING PROTECTION_PAC
Mechanical
BCB0103093 M02 PROPOSED NEW SITE PLAN AND EXTERNAL SERVICES LAYOUT_PAC
BCB0103093 M03 PROPOSED NORTH MECHANICAL PLANT ROOM LAYOUT_PAC
BCB0103093 M04 PROPOSED NORTH MECHANICAL PLANT ROOM SECTIONS_PAC
BCB0103093 M05 PROPOSED SOUTH MECHANICAL PLANT ROOM_PAC
Engineering
10058914-ARC-XX-020-DR-C-00001-P01-Site_Clearance_Sheet_1
10058914-ARC-XX-020-DR-C-00002-P01-Site_Clearance_Sheet_2
10058914-ARC-XX-020-DR-C-00003-P01-Site_Clearance_Sheet_3
10058914-ARC-XX-020-DR-C-00004-P01-Site_Clearance_Sheet_4
10058914-ARC-XX-050-DR-C-00002-P01-Drainage_Layout_Sheet_1
10058914-ARC-XX-050-DR-C-00003-P01-Drainage_Layout_Sheet_2
10058914-ARC-XX-050-DR-C-00004-P01-Drainage_Layout_Sheet_3
10058914-ARC-XX-050-DR-C-00005-P01-Drainage_Layout_Sheet_4
10058914-ARC-XX-050-DR-C-00006-P01-Pond_General_Arrangement
10058914-ARC-XX-050-DR-C-00007-P01-Pond_Cross_Sections
10058914-ARC-XX-050-DR-C-00008-P01-Pitch_1_Attenuation_Layout
10058914-ARC-XX-050-DR-C-00009-P01-Pitch_2_Attenuation_Layout
10058914-ARC-XX-050-DR-C-00010-P01-Drainage_Details_Sheet_1
10058914-ARC-XX-050-DR-C-00011-P01-Drainage_Details_Sheet_2
10058914-ARC-XX-050-DR-C-00012-P01-Drainage_Details_Sheet_3
10058914-ARC-XX-060-DR-C-00002-Earthworks_Layout_Sheet_1
10058914-ARC-XX-060-DR-C-00003-Earthworks_Layout_Sheet_2
10058914-ARC-XX-060-DR-C-00004-Earthworks_Layout_Sheet_3
10058914-ARC-XX-060-DR-C-00005-Earthworks_Layout_Sheet_4
10058914-ARC-XX-070-DR-C-00001-P02-Highway_Layout_Sheet_1
10058914-ARC-XX-070-DR-C-00002-P02-Highway_Layout_Sheet_2
10058914-ARC-XX-070-DR-C-00005-P01-Paved_Areas_Layout_Sheet_1
10058914-ARC-XX-070-DR-C-00006-P01-Paved_Areas_Layout_Sheet_2
10058914-ARC-XX-070-DR-C-00007-P01-Paved_Areas_Layout_Sheet_3
10058914-ARC-XX-070-DR-C-00008-P01-Paved_Areas_Layout_Sheet_4
10058914-ARC-XX-070-DR-C-00013-P01-Vehicle_Tracking_Layout_Sheet_1
10058914-ARC-XX-070-DR-C-00014-P01-Vehicle_Tracking_Layout_Sheet_2
10058914-ARC-XX-070-DR-C-00015-P01-Vehicle_Tracking_Layout_Sheet_3
10058914-ARC-XX-070-DR-C-00016-P01-Vehicle_Tracking_Layout_Sheet_4
10058914-ARC-XX-070-DR-C-00017-P01-Pavement_Typical_Sections
10058914-ARC-XX-071-DR-C-00001-P01-Allotment_Access_Road_Long_Section
10058914-ARC-XX-072-DR-C-00001-P01-Site_Wide_Cross_Sections_Sheet_1
10058914-ARC-XX-072-DR-C-00002-P01-Site_Wide_Cross_Sections_Sheet_2
10058914-ARC-XX-072-DR-C-00003-P01-Site_Wide_Cross_Sections_Sheet_3
10058914-ARC-XX-072-DR-C-00004-P01-Site_Wide_Cross_Sections_Sheet_4
10058914-ARC-XX-072-DR-C-00005-P01-Site_Wide_Cross_Section_Location_Layout
10058914-ARC-XX-110-DR-C-00002-P01-Kerb_Layout_Sheet_1
10058914-ARC-XX-110-DR-C-00003-P01-Kerb_Layout_Sheet_2
10058914-ARC-XX-110-DR-C-00004-P01-Kerb_Layout_Sheet_3
10058914-ARC-XX-110-DR-C-00005-P01-Kerb_Layout_Sheet_4
10058914-ARC-XX-110-DR-C-00006-P01-Kerbs&Paving_Details_Sheet_1
10058914-ARC-XX-110-DR-C-00007-P01-Kerbs&Paving_Details_Sheet_2
10058914-ARC-XX-120-DR-C-00005-P01-Traffic_Sign_Schedule
10058914-ARC-XX-130-DR-C-00001-P01-Street_Lighting_Sheet_1
10058914-ARC-XX-130-DR-C-00002-P01-Street_Lighting_Sheet_2
10058914-ARC-XX-160-DR-SE-00001_03_Retaining Wall_Details
Ecology
Habitats Regulations Assessment Draft
Ecological Impact Assessment Report
Dormouse Mitigation Consultation
Carbon
Thermal Comfort Analysis Draft
Stage 2 Embodied Carbon Review
Transportation
CGI
Site Investigation