Asbri Planning Ltd. gives notice that Ron Skinner and Sons is intending to apply for full planning permission for the demolition of the existing building, the importation of inert material and associated works at Unit 6 Tafarnaubach Industrial Estate, Tredegar, NP22 3AA.
Prior to formal submission to the Local Planning Authority and in accordance with the requirements set out in Part 1A of the Town & Country Planning (Development Management Procedure) (Wales) Order 2012, the proposal will be subject to pre-application consultation.
All relevant drawings, reports and supplementary supporting documents are made available for inspection and review online below. If you are unable to access the documents electronically you may request copies of this information by emailing mail@asbriplanning.co.uk.
Anyone who wishes to make representations about this proposed development must do so by the 15th January 2025. We would encourage you to e-mail these to mail@asbriplanning.co.uk , alternatively please download the attached form, and send them to;
Asbri Planning Ltd, Unit 9 Oak Tree Court, Mulberry Drive, Cardiff Gate Business Park, Cardiff, CF23 8RS.
****
Mae Asbri Planning Ltd yn hysbysu bod Ron Skinner and Sons yn bwriadu gwneud cais am ganiatâd cynllunio llawn ar gyfer dymchweli yr adeilad presennol, mewnforio deunydd anadweithiol a’r gwaith cysylltiedig ar Uned 6, Ystad Ddiwydiannol Tafarnaubach, Tredegar, NP22 3AA.
Cyn cyflwyno’r cais yn ffurfiol i’r Awdurdod Cynllunio Lleol ac yn unol a gofynion Rhan 1A o Orchymyn Cynllunio Gwlad a Thref (Gweithdrefn Rheoli Datblygu) (Cymru) 2012, bydd y cais yn destun ymgynghoriad.
Mae’r cynlluniau, adroddiadau a dogfennau ategol ar gael i’w harchwilio a’u hadolygu ar-lein, isod.
Dylai unrhyw un sydd yn dymuno gwneud sylwadau ynglŷn a’r datblygiad arfaethedig ysgrifennu at yr asiant drwy ebostio mail@asbriplanning.co.uk neu drwy lawrlwytho'r ffurflen yma ac anfon i Asbri Planning Ltd, Uned 9 Oak Tree Court, Mulberry Drive, Cardiff Gate Business Park, Caerdydd, CF23 8RS erbyn 15ed o Ionawr 2025.
Supporting Documents
Plans
Parking Layout Swept Path Analysis 1 of 3
Parking Layout Swept Path Analysis 2 of 3
Parking Layout Swept Path Analysis 3 of 3
Cross Section Engineering Plan
Reports
Planning, Green Infrastructure, Design and Access Statement
Reptile Mitigation Strategy and Biodiversity Enhancements