Land off Bro Einion, Llanybydder, Carmarthenshire / Tir oddi ar Bro Einion, Llanybydder, Sir Gaerfyrddin
Asbri Planning Ltd. gives notice that Ian Thomas Construction and Bro Myrddin housing (joint applicants) to progress a Pre-Application Consultation (PAC) in respect of the proposed residential development and associated works at Land off Bro Einion, Llanybydder, Carmarthenshire.
In accordance with Part 1A of The Town and Country Planning (Development Management Procedure) (Wales) (Amendment) Order 2016 (“the 2016 Order”), all major developments are required to be subject to pre-application consultation, prior to the Planning Application being validated by the Local Planning Authority. Under Section 2C Asbri Planning are required to make a draft valid planning application available publicly for comment for no less than 28 days.
All relevant drawings, reports and supplementary supporting documents are available for inspection and review below.
Anyone who wishes to make representations about this proposed development must do so by the 4th of April 2025. We would encourage you to e-mail these to mail@asbriplanning.co.uk or alternatively please download the attached form, and send them to Asbri Planning Ltd, Unit 9 Oak Tree Court, Mulberry Drive, Cardiff Gate Business Park, Cardiff, CF23 8RS.
Mae Asbri Planning Cyf wedi ei gomisiynu gan Ian Thomas Construction and Bro Myrddin housing (ymgeiswyr cyd) i drefnu ymgynghoriad cyn gwneud cais cynllunio llawn ar gyfer datblygiad preswyl arfaethedig a gwaith cysylltiedig ar Tir oddi ar Bro Einion, Llanybydder, Sir Gaerfyrddin.
Yn unol â Rhan 1A o Orchymyn Cynllunio Gwlad a Thref (Gweithdrefn Rheoli Datblygu) (Cymru) (Diwygio) 2016, mae gofyniad i bob datblygiad mawr gynnal ymgynghoriad cyn-ymgeisio i’r awdurdod lleol. Mae yna ofyn i Asbri Planning hysbysu dogfennau a manylion sydd yn ofynnol er mwyn i’r cais fod yn un dilys am o leiaf 28 diwrnod.
Mae’r cynlluniau, adroddiadau a dogfennau ategol ar gael i’w harchwilio a’u hadolygu ar-lein, isod.
Dylai unrhyw un sydd yn dymuno gwneud sylwadau ynglŷn â’r datblygiad arfaethedig wneud erbyn 4ydd o Ebrill 2025. Rydym yn eich annog i e-bostio eich sylwadau at mail@asbriplanning.co.uk, neu lawrlwytho’r ffurflen atodol a’u ‘yrru i Asbri Planning Cyf, Uned 9 Oak Tree Court, Mulberry Drive, Parc Busnes Porth Caerdydd, CF23 8RS.
Supporting Documents
Plans
Architectural
Existing Site Plan with Topo Survey
Semi Detached Proposed Floor Plans, Elevations & Section
Semi Detached Proposed Floor Plans, Elevations & Section
Semi Detached Proposed Floor Plans, Elevations & Section
Semi Detached Proposed Floor Plans
Semi Detached Proposed Elevations & Section
Semi Detached Proposed Floor Plans
Semi Detached Proposed Elevations & Section
Engineering
Engineering Site Plan Planning Levels
Engineering Site Plan Planning Drainage
Engineering Site Plan Planning Drainage
Reports
Planning Design and Access Statement
Detailed Soft Landscape Proposals
Ecology and Landscape Mgmt Plan and Biodiversity Enhancment Plan
Geotechnical and Geoenvironmental Report Part 1
Geotechnical and Geoenvironmental Report Part 2
Geotechnical and Geoenvironmental Report Part 3
Geotechnical and Geoenvironmental Report Part 4
Green Infrastructure Statement
Landscape Specification & Management Plan