029 2073 2652
About UsContact Us
Mitchell Court, Tonypandy, CF40 2RD

Mitchell Court, Tonypandy, CF40 2RD

1

Asbri Planning has been instructed by Trivallis Housing Association to progress a Pre-Application Consultation (PAC) in respect of the proposed residential redevelopment and associated works at Mitchell Court, Tonypandy.  

In accordance with Part 1A of The Town and Country Planning (Development Management Procedure) (Wales) (Amendment) Order 2016 (“the 2016 Order”), all major developments are required to be subject to pre-application consultation, prior to the Planning Application being validated by the Local Planning Authority. Under Section 2C Asbri Planning are required to make a draft valid planning application available publicly for comment for no less than 28 days.

All relevant drawings, reports and supplementary supporting documents are available for inspection and review below.

Anyone who wishes to make representations about this proposed development must do so by the 7th January 2025. We would encourage you to e-mail these to mail@asbriplanning.co.uk or alternatively please download the attached form, and send them to Asbri Planning Ltd, Unit 9 Oak Tree Court, Mulberry Drive, Cardiff Gate Business Park, Cardiff, CF23 8RS.

****

Mae Asbri Planning Cyf  wedi ei gomisiynu gan Cymdeithas Tai Trivallis i drefnu ymgynghoriad cyn gwneud cais cynllunio llawn am ailddatblygiad preswyl arfaethedig a gwaith cysylltiedig yn Mitchell Court, Tonypandy, CF40 2RD.

Yn unol â Rhan 1A o Orchymyn Cynllunio Gwlad a Thref (Gweithdrefn Rheoli Datblygu) (Cymru) (Diwygio) 2016, mae gofyniad i bob datblygiad mawr gynnal ymgynghoriad cyn-ymgeisio i’r awdurdod lleol. Mae yna ofyn i Asbri Planning hysbysu dogfennau a manylion sydd yn ofynnol er mwyn i’r cais fod yn un dilys am o leiaf 28 diwrnod.

Mae’r cynlluniau, adroddiadau a dogfennau ategol ar gael i’w harchwilio a’u hadolygu ar-lein, isod.

Dylai unrhyw un sydd yn dymuno gwneud sylwadau ynglŷn â’r datblygiad arfaethedig wneud erbyn 7ed Ionawr 2025. Rydym yn eich annog i e-bostio eich sylwadau at mail@asbriplanning.co.uk, neu lawrlwytho’r ffurflen atodol a’u ‘yrru i Asbri Planning Cyf, Uned 9 Oak Tree Court, Mulberry Drive, Parc Busnes Porth Caerdydd, CF23 8RS.

Supporting Documents

Plans

Architectural

Existing site location plan

Existing Site Plan

Existing site plan (aerial)

Existing Site Context Plan

Topographical Survey

Existing Mitchell Couty Apartment Block Floor Plans - Ground Floor

Existing Mitchell Couty Apartment Block Floor Plans - First Landing - Ground Floor

Existing Mitchell Couty Apartment Block Floor Plans - First Landing - First Floor

Existing Mitchell Couty Apartment Block Floor Plans - Second Landing - Ground Floor

Existing Mitchell Couty Apartment Block Floor Plans - Second Landing - First Floor

Existing Mitchell Court Apartment Elevations 1

Existing Mitchell Court Apartment Elevations 2

Existing Mitchell Court Apartment Elevations 3

Existing site sections 01 of 03

Existing site sections 02 of 03

Existing site sections 03 of 03

Demolition Plan

Proposed Site Masterplan - Ground Floor

Proposed Site Masterplan - Roof

Apartment Floor Plans_Lower Ground Floor General Arrangement

Apartment Floor Plans_Ground Floor General Arrangement

Apartment Floor Plans_First Floor General Arrangement

Apartment Floor Plans_Second Floor General Arrangement

Apartment Floor Plans_Third Floor General Arrangement

Apartment Floor Plans_Roof General Arrangement

Apartment Elevations_North East

Apartment Elevations_South West

Apartment Elevations_North West_South East & Internal Core

Proposed Apartment Elevation _ Massing Comparison

Proposed apartment building sections

Proposed housetype 1 - Floor plans & elevations 5P3B

Proposed housetype 2 - Floor plans & elevations 4P2B

Proposed context elevations (houses) - Berw Road North

Proposed context elevations (houses) - Berw Road East

Proposed context elevations (overall) - Berw Road East

Proposed site sections 01

Proposed site sections 02

Proposed site sections 03

Proposed Perspective CGI

Proposed Perspective Sketch 1

Proposed Perspective Sketch 2

Engineering

General Arrangement Drainage Plan

General Arrangement Levels Plan

Landscape

Illustrative Landscape Masterplan

Hardworks General Arrangement

Softworks & Planting General Arrangement Plan

Planting Schedule

Trees

Tree Constraints Plan

Tree Protection Plan

Reports

Application Form

Design & Access Statement

Drainage Report

Green Infrastructure Statement

Transport Statement

Travel Plan

Outline Landscape Specification

Retaining Wall Visual Observation

Retaining Wall Options

Bat Survey RCT Office Building

Bat Survey Mitchell Court

Preliminary Ecological Assessment

Previous Next